Univabs Construction Services

Most Trusted and Accurate Quantity Takeoffs for US General Contractors and Specialty Contractors Since 2007

OUR STATS

OUR STATS

20,000+

Projects

400,000+

Hours of Quantity Take-Offs

15+

Years of Experience

99%

Accuracy

Prestigious Projects

Some of the prestigious projects are Atlanta Falcons, Atlanta Braves, Dallas Cowboys stadiums, International Airports in Denver, Orlando, Dallas, Austin, Atlanta, Charlotte, Amazon Delivery stations at Texas, Kansas, Tennessee, Wisconsin & Kentucky, Amazon Warehouses in Florida & Texas, Convention Centres in Nashville, Cincinnati, Tampa, Casinos in Oklahoma and Mississippi.

Few Projects List

Stadiums

Atlanta Falcons Stadium
Dallas Cowboys StadiumCitrus Bowl Stadium, Orlando

Airports

Denver International Airport
Austin International Airport
Charlotte International Airport

Convention Centers

Music City Center, Nashville
The Mint Museum, Charlotte
Perot Museum of Nature and Science, Dallas

Hotels / Casinos

Marriot Marquis, Houston
Ritz Carlton, Charlotte
Aventura Hotel, Orlando

Wherehouses

Amazon Warehouses in Florida
Amazon Delivery Stations in Texas
Amazon Delivery Stations in Kansas

Services We Provide

We provide quantity take-offs for

WHAT WE OFFER

  • Demolition as per drawings
  • Concrete Formwork
  • Cast in place Concrete
  • Concrete Reinforcement
  • Architectural Concrete
  • Post-Tensioned Concrete
  • Precast Structural Concrete
  • Landscape Cast in place Concrete
  • Lightweight Insulating Concrete Decking system
  • Unit Masonry
  • Masonry veneer
  • Exterior Stone Cladding
  • Cast Stone Masonry
  • Cold Formed Metal framing
  • Self Adhering Sheet Waterproofing
  • Bentonite Waterproofing
  • Crystalline Waterproofing
  • Bituminous Dampproofing
  • Hot Fluid Applied Rubberised Asphalt Waterproofing
  • Cold Fluid Applied Waterproofing
  • Traffic Coatings
  • Thermal Insulation
  • Sprayed Insulation
  • Exterior Insulation and Finish System
  • Weather Barriers
  • Under Slab Vapor Retarders
  • Fluid Applied Air Barriers
  • Metal Wall Panels
  • Soffit Panels
  • Siding
  • Roofing
  • Sheet Metal Flashing and Trim
  • Flexible Flashing
  • Roof Accessories
  • Vegetated Roof Systems
  • Roof Pavers
  • Penetration Firestopping
  • Applied Fire Protection
  • Firestopping
  • Joint Sealants
  • Expansion Joint Assemblies
  • Interior Doors and Frames
  • Exterior Doors and Frames
  • Moulded Composite Doors
  • Rolling Grills
  • Overhead Coiling Doors
  • Glazed Aluminium Curtain wall
  • Access Doors and Frames
  • Aluminium framed Entrance Doors and Storefronts
  • Aluminium Windows
  • Vinyl Windows
  • Unit Skylights
  • Glazing
  • Mirrors
  • Louvers
  • Gypsum Board Assemblies
  • Plastering
  • Flooring
  • Accoustical Ceiling Panels
  • Accoustical Insulation
  • Carpeting
  • Wall Coverings
  • Anti Graffiti Coating
  • Elastomeric Coating
  • Exterior Painting
  • Interior Painting
  • Concrete Sealer
  • High Performance Coatings
  • Signages
  • Marker Boards
  • Toilet Partitions
  • Toilet and Bath Accessories
  • Wall and Door protection
  • Tub and Shower Enclosures
  • Fire Extinguishers and Cabinets
  • Manufactured Fireplaces

Our Delivery Process

Software That We Use

We use the best quantity estimation softwares that are currently used in the construction industry including

New Project (8)
Planswift-bycc-color-5
New Project (8) (1)

Why Trust Us

  • Round the Clock Coverage
  • We are cost-effective
  • Fast and Accurate take-offs
  • More than 50 highly qualified and experienced Civil Engineers and Architects.
  • Completed over 20,000 projects in the last 15 years
  • 99% accurate estimation
  • We do not provide Quantity Take-Offs to more than one client for the same project

Solve your doubts

Connect with us in case of any queries

Key Personnel

Our team of more than 50 architects and civil engineers are being lead by
Lilly Madhulal BTech Civil MBA Project Manager Quantity Take-Off

Lilly Madhulal

Director Engineering services
B.Tech Civil, MBA

Arun Dey BE Civil Team Leader Quantity Take-Off

Arun
Dey

Manager Quantity Estimation
B.E. Civil

Jaideep Perule B.Arch Team Leader Quantity Take-Off-min

Jaideep Perule

Manager Quantity Estimation
B. Architecture

Arun Dey BE Civil Team Leader Quantity Take-Off

Arun
Dey

Manager Quantity Estimation
B.E. Civil

Vijay Jhode Diploma Civil BTech Civil Team Leader Quantity Take-Off

Vijay Jhode

Manager Quantity Estimation
B. Tech Civil

Untitled design (59)

Perisetti Ravishankar

Manager Quality Control
Diploma Civil

TAKE A FREE TRIAL

Upload a project for free sample takeoff